Dalradian Technical Report

Dalradian Technical Report

Click Here to download via SEDAR the Technical Report entitled "NI 43-101 Feasibility Study Technical Report on the Curraghinalt Gold Project, Northern Ireland” with an effective date of 12 December, 2016 (the “Technical Report”), and prepared by (i) Garett Macdonald, P.Eng. Michael Makarenko, P.Eng., Stacy Freudigmann, P.Eng. and Indi Gopinathan, P.Eng., each of JDS Energy & Mining Inc; (ii) William Harding, 23 C.Geol. of SRK Consulting (UK) Ltd.; and (iii) Jean-Francois Couture, P. Geo, Bruce Murphy, P.Eng., and Cam Scott, P.Eng., each of SRK Consulting (Canada) Inc., each of whom is a “qualified person” for the purpose of NI 43-101".